Barakah-1/2/3/4

Nuclear Power Plant,

APR (4 units), Abu Dhabi, UNITED ARAB EMIRATES

 


Owner/Operator: ENEC / NAWAH

ENECNAWAH


Designer / Main contractor of project: KEPCO

KEPCO


Main contractor (civil works): HSJV, HYUNDAI & SAMSUNG Joint Venture


Post-Tensioning system used: VSL

VSL


Post-Tensioning system supply and installation: DOOSAN

DOOSAN


Role of ELIAS: Project Manager and Site Auditor

 


Project Description

Barakah-1/2/3/4 is UAE’s first nuclear power station. This project includes four APR-1400 nuclear units designed by the Korea Electric Power Corporation (KEPCO). The site is on UAE’s Persian Gulf coastline between the sea and the E11 highway, about 50 km west of Ruwais (closest town) and about 270 km west of Abu Dhabi.

Location of Barakah NPP

Location of Barakah NPP

 


3D animation of APR-1400 Nuclear Power Plant construction

 


About Post-Tensioning

Each reactor building is made of a single-shell post-tensioned concrete containment with 2 geometry types of tendons:

  • 270° loop horizontal tendons
  • Inverted-U shaped vertical tendons

 

The post-tensioning system is un-bonded: bare strands injected with grease.

Example of vertical tendons in PT gallery